41

Installation & Operation Manual, GE Series DPB Busway
March 25, 2013, Rev 0

GE Confidential

Series DPB Busway Installation & Operation Manual

INPUT PM PCB

Input Power Monitor (PM) Board: (Figure 38):
this board monitors two separate 3- phase
power sources including voltage, phase
current and neutral, and ground current as
well as four contact alarm inputs.

SAFETY WARNING

CAUTION

ALL VOLTAGE CONNECTIONS MUST BE FUSED!

TAP OFF BOX MONITORING COMPONENTS

Each Tap Off Box is BCMS-equipped (Figure 39)
and interconnected with the Accumulator Board
via the Communications Cable Connection
scheme (Figure 40).

Branch Monitor Sensor Board (intelliBUS): This
board monitors 3- phase current (phases A, B,
C) for each branch circuit. Depending on the
configuration of the system, not all current
sensors may be employed.

Fusing: The Branch Circuit Monitoring system uses
three fuses (one per phase) to protect the voltage
sensing circuits. Fuses are located on the side of
the Tap Off Box (Figure 34) in screw-type safety
fuses holders. Fuses are Type KTK-R rated at 0.5A.
Note that the state of a fuse on the sensing circuit
will not affect the electrical performance of the
Series DPB Bus System.

J9 Voltage

Configuration

J8 Voltage

Configuration

J11 Input

Current 2

(A, B, C)

J3 CanBUS

Modbus Power

J7 External

Contacts

J10 Input

Current 1

(A, B, C)

J13 Input

Current 2

(N, G)

J12 Input

Current 2

(N, G)

Figure 38 - Input PM PCB

Fuses

IntelliBUS PCB

Figure 39 - Tap Off Box with Branch Circuit Monitoring Installed

Option 3 - TAP OFF BOX AND END FEED MONITORING CONCURRENTLY