GE Industrial Solutions GE Zenith Series DPB User Manual

Page 60

Advertising
background image

52

Installation & Operation Manual, GE Series DPB Busway
March 25, 2013, Rev 0

GE Confidential

Series DPB Busway Installation & Operation Manual

On the right of the page are several buttons which will take you to alarm and setup parameters� All they do is change
the location of the points on the left of the page�

WINDOW TAB

This window is just a direct link into the USB commands� This window does not need to be used by the customer� All the
commands on this page can be done on the previous pages with buttons to make it easier to do�

Advertising