Series dpb busway installation & operation manual – GE Industrial Solutions GE Zenith Series DPB User Manual
Page 24
16
Installation & Operation Manual, GE Series DPB Busway
March 25, 2013, Rev 0
GE Confidential
Series DPB Busway Installation & Operation Manual
2.) Slide the C-clip into bus rail positioning the C-clip as shown in (Figure 11 - Busrail C-Clip Profile View - 400 Amp).
NOTE: Do
not tighten the screws yet.
3.) Position a Splice Connector into the bus rail that has been properly mounted and supported (leveled, aligned).
NOTE: When the busway is mounted horizontally, make sure the Cam Spacers are flush with the top of the Splice Connector
before positioning the assembly. (See Figure 12 - Cam Spacers)
4.) Bring the ends of busrails to be spliced together, position the Splice Pack equally across the joint, position the E-clips, Side
Support Plates, and Grounding plate ready for Splice cam actuation. (See Figure 13 - Busrail C-Clip Splice and E-Clip Loca-
tion - 400 Amp).
5.) Install the Splice per section "INSTALLATION OF THE SPLICE CONNECTOR - 400 AMP".
6.) Position and tighten the two screws of each C-clip.
Figure 11 - Busrail C-Clip Profile View - 400 Amp
Figure 13 - Busrail C-Clip Splice and E-Clip Location - 400 Amp
C-clip
E-clip
Figure 12 - Busrail Cam Spacers
Cam Spacer