5 mechanical installation, 1 how to get started, Af-600 fp high power operating instructions – GE Industrial Solutions AF-600 FP Fan and Pump Drive (460V_575V 150HP and above) User Manual

Page 40

Advertising
background image

5 Mechanical Installation

5.1 How to Get Started

5.1.1 About How to Install

This chapter covers mechanical and electrical installations to and from power terminals and control card terminals.
Electrical installation of options is described in the relevant Operating Instructions and Design Guide.

5.1.2 How to Get Started

The frequency converter is designed to achieve a quick and EMC-correct installation by following the steps described below.

Read the safety instructions before installing the unit.

Mechanical Installation

Mechanical mounting

Electrical Installation

Connection to Mains and Protecting Earth

Motor connection and cables

Fuses and circuit breakers

Control terminals - cables

Quick setup

Keypad

Auto Tune

Programming

Unit size is depending on enclosure type, power range and mains voltage

Illustration 5.1: Diagram showing basic installation including mains, motor,
start/stop key, and potentiometer for speed adjustment.

AF-600 FP High Power Operating Instructions

39

5

Advertising