_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5

Commissioning

This chapter describes the commissioning of a sample project by means of examples. The following

requirements have to be met, so that the respective sample project can be used.

5.1

General system structure

The Lenze project examples are based on the following system structure.

• The Controller is the central control component of the system configuration.
• The sample projects are available for the following bus systems: CAN/EtherCAT.

5.2

Wiring the hardware

Before you can work with the project, the hardware has to be connected to each other. The sample

projects are configured so that the motors rotate if a controller is used as fieldbus node.

• Connect the desired Controller with the fieldbus nodes.
• Connect the devices (controllers, motors) with the corresponding voltage supply

• Connect the components with a suitable fieldbus cable.

[5-1]

System structure with a Controller (Logic)

Further information on the electrical connections can be found in the documentation

supplied. Please read the mounting instructions supplied with the controller first before

you start working!
The mounting instructions include safety instructions which must be observed!