5 python module maintenance, 6 additional maintenance, 7 mb-10 decommissioning – Adept Python User Manual

Page 159

Advertising
background image

Python Module Maintenance

Adept Python Modules User’s Guide, Rev. E

159

15. The final step is to use the Linear Module Calibration Setup function in the

DC_Setup program to recalibrate the axis that had the new battery installed. See

Section 10.4 on page 145

for information on software configuration.

11.5 Python Module Maintenance

The ball screw, linear rail bearings, and ball bearings used in the Python linear modules
are lubricated for life. The ball screw nut and linear rail bearings are fully sealed to retain
the factory lubrication.

11.6 Additional Maintenance

Refer to the

Adept SmartController User’s Guide

for information on changing the lamp

for the Front Panel High Power Indicator.

11.7 MB-10 Decommissioning

Contact Adept Customer Service to determine when the MB-10 unit must be
decommissioned, or removed from service. If it is determined that the MB-10 is no longer
usable, then it must be disposed of according to all local and national regulations
regarding electronic components.

CAUTION:

Adding additional grease or oil to the ball

screw shaft on the linear rails could damage these seals
and reduce the life of the module.

Advertising