Powering on k2 g10 raid – Grass Valley K2 System Guide v.9.0 User Manual

Page 196

Advertising
background image

3. Wait while the primary RAID chassis performs self-test and initialization. This takes 6-8 minutes.

While this is taking place, the Ready LED is illuminated with a steady on light.

4. Watch for the Ready LED to begin blinking at one second intervals. The LED might turn off

and back on two times before starting the one second blink pattern. When the Ready LED is
blinking at one second intervals, the self-test and initialization is complete and the chassis is
ready for use.

Powering on K2 G10 RAID

This topic applies to K2 G10 (Condor) RAID.

1. Verify power and cabling.

2. Press and hold down the power button on the controller, as shown.

Power Cords

(115V/230V)

RDY

LED

RDY

LED

Power Good

LED

Power Good

LED

If the RAID chassis has two controllers, you can press the power button on either controller. You
do not need to press both power buttons.

Pressing the power button on a controller also powers on any connected Expansion chassis. There
are no power buttons on Expansion chassis.

3. Release the power button when the Power Good LED on the power supply is illuminated. This

takes 1-3 seconds.

4. Wait while the primary RAID chassis performs self-test and initialization. This takes about four

minutes. While this is taking place, the RDY LED is illuminated with a steady on light.

5. Watch for the RDY LED to begin blinking at one second intervals. The LED might turn off and

back on two times before starting the one second blink pattern. When the RDY LED is blinking
at one second intervals, the self-test and initialization is complete and the chassis is ready for
use.

196

K2 System Guide

06 November 2012