YSI IQ SensorNet 2020 XT Terminal User Manual
Page 46
Advertising
Installation
System 2020 XT USB
3 - 16
ba76019e01
12/2012
Caution
Only use the plastic tapping screws supplied for attaching the
contact base. They ensure the correct fit.
Premounting the ISO
blind nuts
Fig. 3-6
Premounting the ISO blind nuts (variant 1)
4
Attach the contact base (pos. 5 in Fig. 3-5) on the front
MIQ module with the two plastic tapping screws (pos. 6).
5
On the front MIQ module, remove the two countersunk screws
(pos. 7 in Fig. 3-5) and swing open the module lid.
6
Insert the cheese-head screws (pos. 8 in Fig. 3-6) with the
plastic washers in the drilled mounting holes in the enclosure
and loosely screw in the ISO blind nuts (pos. 9).
9
8
Advertising