YSI IQ SensorNet 2020 XT Terminal User Manual
Page 52

Installation
System 2020 XT USB
3 - 22
ba76019e01
12/2012
Preparing the cable
ends
Fig. 3-14 Prepared cable end
Connecting the cables
The SNCIQ and SNCIQ/UG cables are connected to the terminal strip
in the same way as the SACIQ sensor connection cable (see section
3.5.4):
1
Cut off the cable to the required length.
2
Remove approx. 45 mm of cable insulation (in the case of the
SNCIQ/UG earth cable, remove both the inner and outer
insulation).
3
Only for the SNCIQ/UG earth cable:
strip the outer insulation for further 35 mm.
4
Shorten the exposed shielding braid up to the cable sheath.
5
Shorten the two fillers (plastic inlays) up to the cable sheath.
6
Bare the red and green wires and fit them with wire end
sleeves.
7
Fit the filler stranded wire with a wire end sleeve.
SNCIQ
SNCIQ/UG
approx. 35 mm
approx. 45 mm
approx. 45 mm
1
Open the MIQ module.
2
Select any SENSORNET connection. At the same time, look
out for the SENSORNET designation.