YSI IQ SensorNet 2020 XT Terminal User Manual

Page 49

Advertising
background image

System 2020 XT USB

Installation

3 - 19

ba76019e01

12/2012

Caution

Only use the plastic tapping screws supplied for attaching the
contact base. They ensure the correct fit.

Premounting the ISO

blind nuts

Fig. 3-11 Premounting the ISO blind nuts (variant 2)

5

Attach the contact base (pos. 6 in Fig. 3-10) on the front
MIQ module with the two plastic tapping screws (pos. 7).

6

Insert the cheese-head screws (pos. 8 in Fig. 3-11) with the
plastic washers in the drilled mounting holes in the module lid
and loosely screw in the ISO blind nuts (pos. 9).

8

9

Advertising