YSI IQ SensorNet 2020 XT Terminal User Manual
Page 61
Advertising
System 2020 XT USB
Installation
3 - 31
ba76019e01
12/2012
Premounting the ISO
blind nuts
Fig. 3-21 Mounting the sun shield: Premounting the ISO blind nuts
Mounting the
MIQ module under the
sun shield
Fig. 3-22 Mounting the MIQ module on the SSH/IQ sun shield
2
Remove the two countersunk screws (pos. 5 in Fig. 3-21) and
swing open the module lid.
3
Insert the cheese-head screws (pos. 6 in Fig. 3-21) with the
plastic washers in the drilled mounting holes and loosely screw
in the ISO blind nuts (pos. 7).
7
6
5
Advertising