YSI IQ SensorNet 2020 XT Terminal User Manual

Page 61

Advertising
background image

System 2020 XT USB

Installation

3 - 31

ba76019e01

12/2012

Premounting the ISO

blind nuts

Fig. 3-21 Mounting the sun shield: Premounting the ISO blind nuts

Mounting the

MIQ module under the

sun shield

Fig. 3-22 Mounting the MIQ module on the SSH/IQ sun shield

2

Remove the two countersunk screws (pos. 5 in Fig. 3-21) and
swing open the module lid.

3

Insert the cheese-head screws (pos. 6 in Fig. 3-21) with the
plastic washers in the drilled mounting holes and loosely screw
in the ISO blind nuts (pos. 7).

7

6

5

Advertising