System initialization, Running the performance verification routine – Luminex xPONENT for MAGPIX 4.2 User Manual

Page 118

Advertising
background image

System Initialization

xPONENT for MAGPIX contains a pre-defined routine to prepare the analyzer for data
acquisition. This section describes calibration and performance verification of the system.

Calibrator magnetic beads are used to normalize the settings for the reporter channel and
classification channels. Verification magnetic beads are used to verify calibration and optical
integrity of the system. Fluidics beads are used to assess well-to-well carryover.

If the system is not fully calibrated, a warning message opens.

Once calibrated, the values remain until you recalibrate. You can track system calibration and
verification results through the Calibration and Verification report. Target value information
for calibration and verification beads is available on the Luminex website at http://
www.luminexcorp.com/Support/index.htm.

Calibrate your system at least once a week using the Calibration/Verification button on the
Auto Maint tab of the Maintenance page. In addition, recalibrate the system if any of the
following things occur:

• The delta calibration temperature exceeds ± 5° C.

• You move the instrument.

• You experience sample acquisition problems.

• The instrument undergoes hardware maintenance, such as replacement of a part.

Verify the system daily using the Performance Verification button on the Auto Maint tab of
the Maintenance page. Refer to your assay kit instructions for additional calibration
frequency requirements.

Before you can calibrate the system, you must import MAGPIX calibrator and verification
bead lot information. Do this using the Lot Management tab of the Maintenance page. This
information is available on the CD that accompanies the Performance Verification Kit and
Calibration Kit, and is also available on the Luminex website at http://www.luminexcorp.com/
Support/index.htm.

Running the Performance Verification Routine

Run the Performance Verification routine as part of your daily startup routine.

1. On the Home page, click System Initialization under Daily Activities. The Auto Maint

opens.

2. Add the appropriate reagents to the off-plate reservoirs and the strip well, using the

diagram in the Reagents pane of the Auto Maint tab to guide you.

3. On the Auto Maint tab, click Performance Verification.

4. Click Run.

Maintenance Page

105

Advertising