Inspection and maintenance, Inspection and maintenance -1, Caution – Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 152

Advertising
background image

IM 11M12A01-05E

11-1

11. Inspection and Maintenance

11. Inspection and Maintenance

This chapter describes the inspection and maintenance procedures for the EXAxtZR
Zirconia High-temperature Humidity Analyzer (integrated model) to maintain its
measuring performance and normal operating conditions.

CAUTION

When checking the detector, carefully observe the following:
(1) Do NOT touch the probe if it has been in operation immediately just before being

checked. (The sensor at the tip of the probe heats up to 7508 C during operation. If
you touch it, you will get burned.)

(2) Do not subject the probe to shock or cool it rapidly.

The sensor is made of ceramic (zirconia). If the detector is dropped or bumped into
something, the sensor may be damaged and no longer work.

(3) Do not reuse a metal O-ring to seal the cell assembly. If you replace the cell or

remove it from the probe for checking, be sure to replace the metal O-ring. Other-
wise, the process gas may leak, and then the leaking corrosive gas will cause the
built-in heater or thermocouple to go open circuit, or the detector may corrode.

(4) Handle the probe with care so that the dust-filter mounted screws on the tip of the

probe do not hurt your finger(s).

(5) Before opening or closing the terminal box, first remove dust, sand, or the like from

the terminal box cover.

Advertising