Yokogawa IR200 User Manual

Page 25

Advertising
background image

3 - 12

IM 11G02M01-01E

Terminal block 4

<TN4>

11

12

13

14

15

16

17

18

19

20

1

2

3

4

5

6

7

8

9

10

(M3.5 screw)

Unused

Auto calibration status
contact output
(DO)

Calibration error
contact output
(DO)

Pump ON/OFF contact
output (DO)

Unused

Contact output for

zero calibration

(DO)

Contact output for CH1

span calibration

(DO)

Contact output for CH2

span calibration

(DO)

Contact output for CH3

span calibration

(DO)

Contact output for CH4

span calibration

(DO)

Terminal block 4 <TN4>

Between 1 – 2

: CH4 span calibration contact

output

Between 3 – 4

: CH3 span calibration contact

output

Between 5 – 6

: CH2 span calibration contact

output

Between 7 – 8

: CH1 span calibration contact

output

Between 9 – 10 : Zero calibration contact output

When the calibration contact
output is measured with manual
calibration, the calibration
contact corresponding to cali-

bration channel is conductive.

For the automatic calibration,

they are worked sequentially
according to “6.4 Auto calibra-
tion setting”. If calibration is
not performed, all of them are
open.

Between 11– 12 : For internal connection. Must

not be wired. (Must not be used
as junction terminal.)

Between 13– 14 : Automatic calibration in

progress, contact output. Con-
ductive during automatic
calibration. Open otherwise.

Between 15– 16 : Calibration error contact output.

Conductive when error is
produced at zero or span calibra-
tion. Normally open.

Between 17– 18 : Pump ON/OFF contact output.

(Used for turning ON/OFF the
pump. Conductive during
measurement and open at zero
span calibration.)

Note:

For the output of calibration contacts, see

Item 3.5 (9) “Timing of calibration

contact output”.

Advertising