Warning – INFICON 3000 Micro GC Gas Analyzer Reference Guide User Manual

Page 100

Advertising
background image

22 - 2

PN

07

4-

55

8-

P1

A

3000 Micro GC Guides

4

Before installing the digital I/O module, prepare the instrument for service. Lower the heated
inlets, injectors, and columns to 45°C. Clear Detector Filament: to turn off the detectors.

5

Download the method from EZ IQ onto 3000 Micro GC. Check the EZ IQ Instrument Status
screen by clicking Control >> Instrument Status. Wait until the method setpoints are reached
(i.e., the instrument is in the Ready state).

6

Exit EZ IQ.

7

Set the front panel power switch to the off position. Disconnect the 3000 Micro GC power supply
from the back of the instrument.

WARNING

During this process, the 3000 Micro GC internal components will
be exposed. To avoid damaging 3000 Micro GC, turn the power
switch off and disconnect all external power to 3000 Micro GC.

Table 22-1 Installing the digital I/O module (continued)

Step

Description

Advertising