1 front load – INFICON SQM-160 Thin Film Deposition Monitor User Manual

Page 85

Advertising
background image

6 - 9

IP

N 07

4-

51

1-

P1

C

SQM-160 Operating Manual

6.3.1 Front Load

Follow the procedure below to replace the crystal in the Front Load sensor: (see

Figure 6-1

)

1

Gripping the crystal holder with your fingers, pull it straight out of the sensor
body.

2

Gently pry the crystal retainer from the holder (or use the Crystal Snatcher; see

Figure 6-6 on page 6-14

).

3

Turn the crystal holder over and the crystal will drop out.

4

Install a new crystal, with the patterned electrode face up.

5

Push the retainer back into the crystal holder and replace the crystal holder in
the sensor body.

Figure 6-1 Front Load Crystal Sensor (Exploded)

Front Load Crystal Holder

(IPN 750-172-G1)

Front Load Standard

Crystal Sensor Body

(IPN 750-207-G1)

Crystal (IPN 008-010-G10)

Fully Coated Face (Gold)

Finger Spring Contact

(IPN 750-171-P1)

Crystal Retainer

(IPN 007-023)

In-Vacuum Cable

To XIU

Water Tubes

Advertising