Operating the em920, Meter assembly, Chapter 2 – SATEC EM920 Operation Manual User Manual

Page 14: Chapter 2 operating the em920

Advertising
background image

Chapter 2 Operating the EM920

Meter Assembly

14

EM920 Power Quality and Revenue Meter

Chapter 2 Operating the EM920

Meter Assembly

The meter view with a removed cover and the location of the
expansion slots and lithium battery are shown in the following
pictures.

SECURITY JUMPER LOCATION

Advertising