Operating the em920, Meter assembly, Chapter 2 – SATEC EM920 Operation Manual User Manual
Page 14: Chapter 2 operating the em920
Advertising

Chapter 2 Operating the EM920
Meter Assembly
14
EM920 Power Quality and Revenue Meter
Chapter 2 Operating the EM920
Meter Assembly
The meter view with a removed cover and the location of the
expansion slots and lithium battery are shown in the following
pictures.
SECURITY JUMPER LOCATION
Advertising