Using the devicenet node commissioning tool – Rockwell Automation 193-DNENCATR EtherNet/IP Communications Auxiliary User Manual User Manual

Page 37

Advertising
background image

Rockwell Automation Publication 193-UM014B-EN-P December 2011

37

Chapter 4

2.

Change the node address using the appropriate mechanism for the new
device.

Using the DeviceNet Node Commissioning Tool

A device’s network node address can be set using the Node Commissioning Tool
on the EtherNet/IP Communications Auxiliary web page. This tool uses the
Network Who to view the DeviceNet modules on the network.

Refer to the following guidelines when using the Network Commissioning tool.

• Only use this tool with an online DeviceNet network.
• Only use this tool when adding new devices to the network if :

– the new device does not feature a hardware mechanism to set the node

address or

– the new device’s node address is set higher than 63.

• Each time a new device is added to the DeviceNet network, the procedures

beginning on

page 38

must

be performed.

• To avoid conflict with duplicate node addresses, due largely in part to

modules having a factory node setting of 63, configure a module to the
online DeviceNet network one a time.

• Record the node address for each device that is set by the Node

Commissioning Tool.

Complete the following steps to set a device’s node address using the Node
Commissioning Tool on the EtherNet/IP Communications Auxiliary web page.

Mechanism

Procedure

Rotary Switch

Turn the rotary switch dials to the desired node address value.
Usually, a small, flathead screwdriver is needed to turn the dials.
Once the device is powered up, the rotary switch settings are

recognized. If the set node address value needs to be changed,

power down the device, turn the dials to the desired setting, then

power up the device again.

Push Wheel Switch

Turn the push wheel to the desired node address value.

NOTE:

If the new device features a hardware mechanism and the node address

is set at 63 or lower, the Network Commissioning tool does not change

the device’s node address.

2

4

6

0

PGM

MSD

2

4

6

0

LSD

8

Advertising