Rockwell Automation 1775-S5_SR5,D17756.5.5 User Manual PLC-3 FAMILY I/0 User Manual

Page 55

Advertising
background image

I/O Communication

Chapter 3

3-7

Important: Remember to reset the counter for the MVF, or the move
operation does not function properly.

Backup Communication

You can use the backup communication with the PLC-3 or PLC-3/10
backup feature. The backup feature has an I/O listening mode that enables
the backup system to monitor input data. To transfer other information to
the backup system, you can install a backup communication channel
(Figure 3.5).

With a backup communication channel, you can program data transfers
between the primary and backup controller (Figure 3.5). Then, when the
primary controller shuts down, the backup controller has up-to-date data
for running your application. Such data could be storage, block transfer,
timer, or counter information.

Figure 3.5

Using a Backup Communication Channel

Twinaxial cable for setting

up backup communication

channel.

15412

Primary System Backup System

Backup cable for

setting up type of

switchover.

Important: You cannot use peer-to-peer communication to
communication between the primary and backup system because the
backup processor listens but does not respond to communication received
on a peer-to-peer communication channel.

You configure the primary and backup controllers for the backup
communication channel through LIST. Communication occurs via files
that you specify in LIST (Figure 3.6).

Advertising