Preventative Maintenance Schedule
Appendix C
Final Reporting
1.
A complete, detailed report on all steps in the Preventive Maintenance
procedures should be recorded to identify changes.
•
A completed copy of this checklist should be included.
•
A detailed description of all adjustments and measurements that were
taken during the process should be included in an addendum (Interlock
Adjustments, Loose Connections, Voltage Readings, Megger Results,
Parameters, etc.).
2.
This information should be communicated to MV Product Support so
future support activities have the latest site information available.
•
This can be faxed to (519) 740-4756 or
e-mailed to [email protected].