6 glp test for exchange unit and dosing unit, Glp test for exchange unit and dosing unit, Figure 9 – Metrohm 900 Touch Control Manual User Manual
Page 72: Exchange unit – tubing connections
8.6 GLP test for exchange unit and dosing unit
■■■■■■■■■■■■■■■■■■■■■■
56
■■■■■■■■
900 Touch Control
1
2
3
Figure 9
Exchange unit – tubing connections
1
Tubing to the reagent bottle
2
Tubing to the dosing tip
3
Tubing to the dosing cylinder
8.6
GLP test for exchange unit and dosing unit
Titrant: Edit
▶ Dosing unit / Exchange unit ▶ GLP test
In the dialog Exchange unit / GLP test or Dosing unit / GLP test,
respectively, you can define the time interval after which a GLP test must
be carried out again for the exchange unit or dosing unit.
GLP test date
Date on which the last GLP test was carried out.
Format: YYYY:MM:DD
Monitoring
on | off (Default value: off)
If this parameter is activated, then the time interval after which a GLP test
has to be carried out again will be monitored.