1 establishing the configuration task, Applicable environment, Preconfiguration tasks – Panasonic NN46240-501 User Manual

Page 194: Data preparation, 1 establishing the configuration task -9, Managing the device operation, 3 managing the device operation

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

10 Router maintenance

Nortel Secure Router 8000 Series

Configuration Guide - Basic Configuration

10.3 Managing the device operation

10.3.1 Establishing the configuration task

Applicable environment

The following operations are common for daily router maintenance:

1.

Specifying the slave RPU

CQ NOTE

Secure Routers 8002, 8004, and 8008 contain only one RPU, so they do not support this function.

When Secure Router 8012 restarts, the master and slave RPUs are not fixed. The two

RPUs compete for the status of master RPU. When the master and slave RPUs operate

normally, you need to run a command to specify the slot number of the slave RPU if you
want the slot number of the master RPU to be fixed.

2.

Restarting the router

After an upgrade, you may need to restart the router. The three types of restarts are as
follows:

- Restarting the specified board

This operation stops only the services on the specified board and has no effect on
other boards.

- Restarting the router immediately

After this operation, the router restarts immediately and stops all services on the
router.

- Restarting the router at a specified time

If the router restarts at a busy time, services are affected. Through this operation, you
can specify to restart the router at a time with few services. This reduces the impact
on services.

3.

Performing master/slave switchover

CQ NOTE

Secure Routers 8002, 8004, and 8008 contain only one RPU, so they do not support this function.

A master/slave switchover of the router occurs in the following two situations:

- The master RPU fails and the system automatically perform the master/slave

switchover.

- The master/slave switchover is performed forcibly through the command line

interface (CLI).

Preconfiguration tasks

Before you manage the device operation, complete the following tasks:

Complete the router installation and power it on.

Ensure that you can log on to the router.

Data preparation

None.

10-4

Nortel Networks Inc.

Issue 5.3 (30 March 2009)

Advertising