SMA Sunny Boy Control Light User Manual

Page 79

Advertising
background image

Sunny Boy Control Light

Chapter 7: Appendix

SUNBCL-11:NE

- 79 -

SMA Regelsysteme GmbH

and informs you about the transmission results so that you can identify

transmission defects immediately.

Plug the extension cable into different sockets of the mains line you are

analyzing while continuously increasing distance to the inverter, and check

whether the communication still works. A communication breakdown from a

certain line length to the inverter on (< 30 m) indicates a disturbance from

external devices outside the household distribution (countermeasure:

suppression filter in the branch circuit).

Now reconnect the mains circuits one after the other and check if any errors

occur in the communication of Sunny Boy Control Light.

In case of communication disturbances disconnect every electric consumer on

the last connected circuit one after the other in order to identify the disturbing

device.

Leave disturbing devices disconnected from the mains and continue connecting

circuits and devices until all electric consumers are reconnected to the mains

except the disturbing ones.

Optimizing the Installation

Check whether the influence of disturbing devices can be reduced sufficiently

by just connecting them to another circuit resp. phase.

A junction line from the device to the Sunny Boy Control Light can help

reduce the filter expenditure in heavily disturbed installations.

Filtering Interference

Supply the section of the electric installation for Powerline communication with a

suppression unit.