Sunny Boy Control Light

Chapter 7: Appendix

SUNBCL-11:NE

- 81 -

SMA Regelsysteme GmbH

7.2.3 Communication

Testing the Communication

The reliability of a communication link can be tested with:

•

2 Sunny Boy Control Light

•

1 Sunny Boy Control Light and a PC with a Sunny Boy Control Light, Sunny

Boy Control or a SWRCOM.

It is recommendable to test the communication link before installing the system.

Test with two Sunny Boy Control Light

•

connect both Sunny Boy Control Light to the same wall socket, where you want

to connect a part of the participants for your communication.

•

Switch the data acquisition of Sunny Boy Control Light A off:

"

Setup - System - Service Funct.: reset system

Setup - System - Service Funct.: reset system

Setup - System - Service Funct.: reset system

Setup - System - Service Funct.: reset system

". Confirm twice,

the Sunny Boy Control Light A will start the Plug & Play sequence the next time

it is activated.

•

start the device detection on for the Sunny Boy Control Light B.

("

Setup - PV-Plant - Detection

Setup - PV-Plant - Detection

Setup - PV-Plant - Detection

Setup - PV-Plant - Detection

"). This lets the Sunny Boy Control Light

B detect the Sunny Boy Control Light A.

•

connect Sunny Boy Control A to the furthest away socket you want to connect

participants to. Define the Sunny Boy Control Light A to be communication test

participant in the "

Setup - Diagnosis - Communication

Setup - Diagnosis - Communication

Setup - Diagnosis - Communication

Setup - Diagnosis - Communication

" menu.

Acceptable data transmission quality is given with 75 % and more.

Test with one Sunny Boy Control Light and one PC with a SWRCOM

•

Sunny Data must be installed on the PC

•

connect the PC and the Sunny Boy Control Light to the same socket.