7.2.3 Communication

Testing the Communication

The reliability of a communication link can be tested with:

2 Sunny Boy Control Light

1 Sunny Boy Control Light and a PC with a Sunny Boy Control Light, Sunny

Boy Control or a SWRCOM.

It is recommendable to test the communication link before installing the system.

Test with two Sunny Boy Control Light

connect both Sunny Boy Control Light to the same wall socket, where you want

to connect a part of the participants for your communication.

Switch the data acquisition of Sunny Boy Control Light A off:

"

Setup - System - Service Funct.: reset system

Setup - System - Service Funct.: reset system

Setup - System - Service Funct.: reset system

Setup - System - Service Funct.: reset system

". Confirm twice,

the Sunny Boy Control Light A will start the Plug & Play sequence the next time

it is activated.

start the device detection on for the Sunny Boy Control Light B.

("

Setup - PV-Plant - Detection

Setup - PV-Plant - Detection

Setup - PV-Plant - Detection

Setup - PV-Plant - Detection

"). This lets the Sunny Boy Control Light

B detect the Sunny Boy Control Light A.

connect Sunny Boy Control A to the furthest away socket you want to connect

participants to. Define the Sunny Boy Control Light A to be communication test

participant in the "

Setup - Diagnosis - Communication

Setup - Diagnosis - Communication

Setup - Diagnosis - Communication

Setup - Diagnosis - Communication

" menu.

Acceptable data transmission quality is given with 75 % and more.

Test with one Sunny Boy Control Light and one PC with a SWRCOM

Sunny Data must be installed on the PC

connect the PC and the Sunny Boy Control Light to the same socket.