ProSoft Technology PTQ-AFC User Manual

Page 125

Advertising
background image

PTQ-AFC ♦ Modicon Quantum Platform

Quick Start

Liquid and Gas Flow Computer for Hydrocarbon Products

User Manual

ProSoft Technology, Inc.

Page 125 of 259

June 23, 2011

Grup

Sbgp

Item

DTyp

Rkv

Data point

10

Usht

(5)

Component 11, scaled molar fraction

11

Usht

(5)

Component 12, scaled molar fraction

12

Usht

(5)

Component 13, scaled molar fraction

13

Usht

(5)

Component 14, scaled molar fraction

14

Usht

(5)

Component 15, scaled molar fraction

15

Usht

(5)

Component 16, scaled molar fraction

16

Usht

(5)

Component 17, scaled molar fraction

17

Usht

(5)

Component 18, scaled molar fraction

18

Usht

(5)

Component 19, scaled molar fraction

19

Usht

(5)

Component 20, scaled molar fraction

20

Usht

(5)

Component 21, scaled molar fraction

21

Usht

(5)

Component 22, scaled molar fraction

22

Usht

(5)

Component 23, scaled molar fraction

23

Usht

(5)

Component 24, scaled molar fraction

6.12.11 "Rkv"

notes

1

Archives (only, not resets) are forced regardless of configuration, capturing
any unarchived data from the previous session.

2

Archives and resets are scheduled (immediately, without a "period-end"
delay) only for the initial setting of the wallclock; a "five-minute" event causes
no scheduling. This ensures capture of any flow that has occurred prior to the
initial clock-set.

3

Event occurs only when one or more of the following bits are changed:

o

Bit 2, "Barometric pressure units"

o

Bit 5, "Process input out of range use last good"

o

Bit 12, "Analysis is packed in module"

o

Bit 13, "Analysis is packed over backplane" (1756 and 1769 platforms
only)

4

A change to Meter Control Options bit 15, "Meter enable", imposes these
adjustments to the normally-scheduled archives/resets:

o

Upon meter enable, cancel any scheduled archives (no data yet to be
archived), but leave in place any scheduled resets.

o

Upon meter disable, cancel any resets (for inspection and so on.; reset
will be rescheduled upon subsequent enable), and force archiving of both
files regardless of configuration (so that a disabled meter never has any
pending unarchived data).

5

Events occur only if Meter Control Options bit 10, "Treat analysis as process
input", is clear.

Advertising
This manual is related to the following products: