Verifying proper operation – Brocade FastIron SX Series Chassis Hardware Installation Guide User Manual

Page 145

Advertising
background image

1

Ground

2

DC power

5.

Re-attach the transparent cover that was removed in step 1 .

6.

Connect the wire to your DC power source making sure to connect the positive and negative supply
wires to the correct location as marked on the power supply.

7.

Observe the LEDs on the power supply front panel. The DC IN and DC OUT LEDs should be green
(steady), which indicates the power supply is providing power to the chassis components. If it is
amber or OFF, the power supply is not providing power to the chassis components. The ALM LED
should be OFF.

Verifying proper operation

To verify the proper operation of the power supply after power on, you can observe the LEDs on the
power supply. The table below outlines the LEDs, the desired state of each LED, possible abnormal
states of each LED, and what to do if an LED indicates an abnormal state.

Verifying proper operation

Brocade FastIron SX Series Chassis Hardware Installation Guide

143

53-1003092-01

Advertising