Verifying proper operation – Brocade FastIron SX Series Chassis Hardware Installation Guide User Manual

Page 75

Advertising
background image

This equipment installation must meet NEC/CEC code requirements. Consult local authorities for
regulations.

FIGURE 35 Reconnect lugs to power supply.

1

Ground

2

DC power

5.

Re-attach the transparent cover that you removed in Step 1.

6.

Connect the positive and negative supply wires to the correct locations on your DC power source,
as marked on the power supply.

7.

Observe the LEDs on the power supply front panel. The DC IN and DC OUT LEDs should be green
(steady), which indicates the power supply is providing power to the components. If it is amber or
OFF, the power supply is not providing power to the components. The ALM LED should be OFF.

Verifying proper operation

To verify the proper operation of the chassis after the power is on, you can:

Verifying proper operation

Brocade FastIron SX Series Chassis Hardware Installation Guide

73

53-1003092-01