2 operating power, Operating power – Fire-Lite MS-10UD Series FACP User Manual

Page 28

Advertising
background image

28

MS-5UD & MS-10UD Series Manual — P/N 52626:C4 3/7/2014

Installation

Operating Power

2.2 Operating Power

Primary Power Source (AC) and Earth Ground Connections

AC power connections are made inside the control panel cabinet. Refer to AC Power in the sec-
tion titled “Specifications” on page 15, for power and current requirements for each FACP version.
Run a pair of wires (with ground conductor) from the protected premises main breaker box to the
AC terminal block TB1 on the main power supply. As per the National Electrical Code, use 14
AWG (2.00 mm

2

, 1.6 mm O.D.) or heavier gauge wire with 600V insulation. No other equipment

!

WARNING: RISK OF ELECTRICAL SHOCK AND/OR EQUIPMENT DAMAGE
SEVERAL DIFFERENT SOURCES OF POWER CAN BE CONNECTED TO THIS PANEL.
DISCONNECT ALL SOURCES OF POWER BEFORE SERVICING. THE PANEL AND
ASSOCIATED EQUIPMENT MAY BE DAMAGED BY REMOVING AND/OR INSERTING CARDS,
MODULES OR INTERCONNECTING CABLES WHILE THIS UNIT IS ENERGIZED.

Figure 2.3 Backbox and Battery Box

90

50

UD

ca

b2

.w

mf

Door = 19.26” (48.92 cm)
Backbox = 19.0” (48.26)

Door = 16.821” (42.73 cm)
Backbox = 16.65” (42.29 cm)

Depth = 5.207” (13.23 cm)

Depth = 5.257”

(13.353 cm)

Top

Left Side

Right Side

Bottom

Advertising
This manual is related to the following products: