Remote maintenance and diagnostics

11.1

Status LEDs of the Controllers

81

Lenze · Controller | Parameter setting & programming · Reference Manual · DMS 1.5 EN · 04/2014 · TD17

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Depending on the running software application, different control modes of the LEDs are possible.

green

constantly on

Controller is running (operating status):

• PLC project is running (device is running, operating status)

blinking

(0.5 Hz)

Starting process of the Controller active

green

Yellow

blinking

(0.5 Hz)

User action required:

• "Load PLC project": PLC started, project is not running

• Remove USB flash drive

Status 2

-

-

No function

* Device-dependent LED colour: Either green or blue

Online help for »Backup & Restore«
Here, further information on the »Backup & Restore« specific LED signals can be found.