Helpful hints, Validating applications and transferring files, Chapter – Rockwell Automation 2706-MB1 MESSAGEVIEW 421 SOFTWARE MANUAL User Manual

Page 237

Advertising
background image

Chapter

11

Publication 2706-817

Validating Applications and

Transferring Files

This chapter covers the following topics:

Helpful hints

Validating applications

Transfer utilities

Downloading an application to a terminal

Downloading to a DOS file

Downloading time/date to Real Time Clock

Uploading an application from a terminal

Uploading the Historical Event Stack

Using the MessageView File Transfer Utility

Terminal upgrade.

MessageBuilder applications are normally saved to MBA files.
The MBA file is translated and saved as an MVA file during the
download process, whether to a MessageView terminal or to a
DOS file.

Applications are validated (checked for errors) during the
download process. It is also helpful to validate applications as
part of the creation process, and correct any errors before trying
to download.

An application can be downloaded only to a terminal it is
designed for. However MessageBuilder software can reconfigure
an application for another type of terminal. See Page 10–3.

Transferring applications between a computer and MessageView
Terminal using an RS-232 connection requires the
INTERCHANGE DF1 driver. This driver was installed as part of
the MessageBuilder software installation.

See the MessageView Operator Terminals user manual on how to
connect the computer and with a MessageView 421 terminal’s
RS–232 port.

Helpful Hints

Advertising