Paxton Superchargers Ford Mustang GT User Manual

Page 23

Advertising
background image

P/N: 4809654 v5.0

©2010 Paxton Automotive

All Rights Reserved, Intl. Copr. Secured

3

Fig. 1-j

Fig. 1-i

8mm HEADED

SCREWS

1. PREPARATioN/REMovAL,

cont’d

P. Using a 1/2" ratchet, release the tension from

the accessory drive belt and remove it from the

car. This drive belt will be replaced with a lon-

ger one later in the installation.

vacuum line from the fuel regulator.

Remove the rails and injectors as a com-

plete unit and set aside. New injectors will

be installed in a later step. (See Figs. 1-i,

1-j.)

4. Locate and remove the remaining 10mm

headed bolts retaining the intake manifold

to the cylinder heads. There are

five on

each side.

5. (2005-2006 Only): Remove the intake

manifold and set aside so it can be rein-

stalled after modifications to the coolant

crossover tube are made.

6. (2007-2010 Only): It is not necessary to

remove the intake manifold from the vehi-

cle completely. Raise the front of the man-

ifold 3-4" and support between the throt-

tle-body and alternator.

*** NOTE ***

Modification to the crossover tube will be com-

pleted in a later step

*** NOTE ***

Modification to the crossover tube will be com-

pleted in a later step

Advertising