Paxton Superchargers Ford Mustang GT User Manual

Page 72

Advertising
background image

P/N: 4809654 v5.0

©2010 Paxton Automotive

All Rights Reserved, Intl. Copr. Secured

52

11. CRANk CASE BREATHER AND PCv

iNSTALLATioN

A. Locate the pre-assembled PVC/MAF assembly

4FU139-096.

B. Locate the factory 5/8" x 90° hose end connec-

tor and the factory striaght hose connection

removed in a previous step. Connect the hose

closest to the PCV valve to the 90° fitting as

shown in picture using stepless clamps provid-

ed. Connect the straight connector to the

remaining hose using the stepless clamps pro-

vided.

C. Install the hose assembly between the driver’s

side valve cover and the intake manifold.

Secure hose connections as necessary using the

supplied hose clamps. (See Figs. 11-a, 11-b for

assistance.)

D. Locate the factory 3/8" x 90° fitting removed

from the passenger’s side valve cover in a pre-

vious step.

E. Connect the remainder of the supplied 3/8"ID

hose to the 90° fitting and connect to the pas-

senger’s side valve cover using the stepless

clamps provided. (See Fig. 11-c.)

F. Route the open end of the 3/8" hose behind the

alternator and across to where the air inlet duct

will be located.

Fig. 11-a

Fig. 11-b

Fig. 11-c

FACTORY STRAIGHT

CONNECTOR

CONNECTION ON

PASSENGER’S SIDE

FACTORY 90° HOSE

CONNECTOR

FACTORY

STRAIGHT

CONNECTOR

FACTORY 90° HOSE

CONNECTOR

FACTORY 90° HOSE

CONNECTOR

Section 9

AIR DISCHARGE ASSEMBLY INSTALLATION

(NON-COOLED KITS ONLY)

PCV VAVLE

PCV VAVLE

Advertising