8C. CoMPRESSoR ByPASS vALvE #1

ASSEMBLy iNSTALLATioN: (2005-2006

H.o. kits only)

1. Cut a piece of the provided 1" heater hose

approximately 3" long and secure it to the by-

pass valve inlet (opposite the vacuum port)

using the #16 hose clamps provided.

2. Locate the 1" molded rubber 90° elbow and cut

approximately 6" from the long end and 1"

from the short end. Attach the long end to the

by-pass valve discharge and secure using the

#16 hose clamps provided. (See Fig. 8C-a,

8D-c.)

3. Attach the open end of the 3" long hose to the

by-pass port on tube “A” and secure using a

#16 hose clamp. The open end of the 90° hose

will be connected to the inlet duct in a later

step. (See Fig. 8D-c.)

Fig. 8C-a

(TRIM TO APPROX. 5.75")

TO INLET DUCT

BYPASS VALVE

(TRIM TO

APPROX 4”)

3” x 01” HOSE (TRIM TO FIT)

TO DISCHARGE TUBE “A”

7U133-100 MOLDED 90 DEGREE-

HOSE TRIM TO FIT