Hardware installation, Overview, Pre-installation requirements – Enterasys Networks CSX6000 User Manual

Page 83: Hardware installation 83, Overview 83 pre-installation requirements 83, Ardware, Nstallation

Advertising
background image

H

ARDWARE

I

NSTALLATION

O

VERVIEW

This chapter provides a description of the hardware installation process. It includes:

pre-installation requirements

selecting slots for adapters

setting switches

inserting adapters into backplane

connecting inter-board cables

Your distributor may have already completed this adapter installation. If not, follow this chapter’s
specific instructions.

P

RE

-I

NSTALLATION

R

EQUIREMENTS

Before you begin the installation process, be sure to:

Choose a suitable setup location

Make sure the location is dry, ventilated, dust free, static free, and free from corrosive
chemicals

Verify system power requirements

If applicable, make sure the line voltage select switch is set for the AC input power source
you are going to use. The appropriate standard power cord is supplied with the system.

CAUTION:
When changing the line voltage select switch, make sure the AC power cord is unplugged.

Verify cabling requirements

The cabling included with your shipment will depend on the country in which your system
will operate. If additional cabling is needed other than what was shipped, contact your
distributor.

Only qualified personnel should install adapters into the
CyberSWITCH.

!

CAUTION

Any time you remove the system module cover, unplug the power
cord. Failure to do so may result in personal injury or equipment
damage.

The CyberSWITCH is sensitive to static discharges. Use a
grounding strap and observe all static precautions during this
procedure. Failure to do so could result in damage to the
CyberSWITCH.

Advertising
This manual is related to the following products: