Powering off and restarting – ATEN KN Series 32-Port KVM over IP Switch with Dual Power/LAN (1-Local + 4-Remote Access) User Manual

Page 55

Advertising
background image

Chapter 2. Hardware Setup

37

Powering Off and Restarting

If it becomes necessary to power off the switch, or if the switch loses power
and needs to be restarted, wait 30 seconds before powering it back on. The
servers should not be affected by this, but if any of them should fail, simply
restart them.

Advertising