2 sub program control, 3 interrupt program control, 2 sub-program control – Toshiba T2N User Manual

Page 129: User program running control 116

Advertising
background image

3.User Program Running Control

116

PROSEC T2N

When RUN starts up, sub program #1 is run once only before the main program

is executed on the first scan. Therefore, use sub program #1 as the initial

setting program at the starting of the operation.

The first scan operation is shown in the following diagram.

When the interrupt condition is set up, the interrupt program stops other operations

and is executed immediately. As shown below, you can register one timer

interrupt program which starts up according to a cycle set up in system

information and 4 I/O interrupt programs which start up according to interrupt

signals from I/O modules with an interrupt function* (No.1 - No.4).

Interrupt program

Operation

Fixed cycle
timer interrupt

Runs acording to the user specified interruption
cycle time in system information. The interruption
cycle time is set at 5 to 1,000ms (units 5ms)

I/O interrupt No.1
ž I/O interrupt No.4

I/O interrupt programs run by interrupt signals
generated from I/O modules with interrupt function*

*) I/O modules with an interrupt function is under development.

3.2

Sub program control

mode

mode mode transition

I/O

timer Sub #1

main

first scan

RUN mode
transition

HALT mode or

system initialization

3.3

Interrupt program control

Timer interrupt cycle

Timer interrupt cycle

timer

timer

timer

I/O #1

I/O #4

I/O #2

I/O interrupt No.4

interrupt conditions.

Fixed cycle timer interrupt

I/O interrupt No.1

scan

scan

scan

scan

scan

scan

I/O interrupt No.2

Advertising