4.Installation and Wiring

68

PROSEC T2N

Turn on power or turn off power of the T2N according to the following sequence

so that the T2N is used safely and securely.

(Power up sequence)

(1) Turn on power of the T2N at first. When using expansion units, arrange for

power to be supplied simultaneously to the basic unit and the expansion

units.

Use the same power lines for them.

If it is difficult, turn on power of the expansion units before turing on that of

the basic unit.

(2) Turn on power for I/O modules and loads simultaneously.

Use the same power lines for them.

If it is difficult, turn on the external power for I/O modules before turing on the

power for the loads.

(Power down sequence)

(1) Turn off the external power for I/O modules and loads simultaneously.

Or turn off power for loads and turn off power for I/O modules in turn.

(2) Turn off power of the T2N.

When using expansion units, turn off power of the basic unit and the expansion

units simulataneously.

Or turn off power of the expansion units after turning off power of the basic unit.

!

CAUTION

1. Configure the external circuit so that the external power required for output

modules and power to the loads are switched off simultaneously.
Also, turn off to the loads before turning off power to the T2N.

(1) Turn on the T2N’s power

(2) Turn on the power for I/O modules and

loads

(2) Turn off power to

the T2N.

(1) Turn off the external power for I/O modules

and loads.

4.9

Power up/down

Sequence