Entellisys Low Voltage Switchgear

Chapter 2. Receiving, Handling, and Storage

2-2 Handling

NOTE: It is preferable to leave the shipping skids in

place under the switchgear until it reaches its final

location. The equipment should be installed in its final

location prior to installing the circuit breakers.

NOTE: Il est préférable de laisser l’emballage

d’expédition en place sous le dispositif de commutation

jusqu’à ce qu’il atteigne son emplacement final.

L’équipement devrait être installé à son emplacement

final avant que ne soient installés les disjoncteur.

Lifting

The switchgear sections are best handled by lifting with a

crane as shown in Fig. 2-3. Removable lifting plates are

provided, as standard equipment, on the top of each

switchgear shipping section. To preserve the external

appearance of the equipment, it is suggested that the lifting

plates be left in place except where adjacent equipments

must be bolted together, i.e. shipping splits, etc.

Utilize four equal length cables and an overhead crane, each

with a minimum load rating of twice the weight of the

switchgear. Estimated weights for shipping splits appear on

the Front View drawings.

Example: Switchgear Section Weight = 5,000 pounds. The

crane and the four lift cables must have a minimum load

lifting capacity of 10,000 pounds.

NOTE: The angle between the cables and the top of the

equipment must be at least 45 degrees. If this is not

possible because of lack of headspace, spreader bars must

be used. Also, lift cables with greater load capability may

be necessary, depending upon the angle between the

cables and the crane hook.

NOTE: Il faut que l’angle entre les câbles et le haut de

l’équipement soit d’au moins 45 degrés. Si cela est

impossible à cause d’une insuffisance d’espace de

dégagement, il faut utiliser des barres d’extension. Il se

peut aussi que des câbles de levage ayant une capacité de

poids supérieure soient nécessaires dépendant de l’angle

entre les câbles et le crochet de la grue.

Connect a cable from the crane to the four lifting plates

located on the top-front and rear of the switchgear (Fig. 2-3).




WARNING

ADVERTISSEMENT

WHEN LIFTING THIS

EQUIPMENT, USE LIFTING
HOLES PROVIDED. ANGLE

OF SLING MUST NOT BE

LESS THAN 45 DEGREES. IF

HEAD SPACE IS

INSUFFICIENT, USE A

SPREADER BAR.


Lorsque cet équipement

est levé, il faut utiliser les

trous de levage qui sont

fournis. Il ne fuat pas que

l’angle d’élinguje soit de

moins de 45 degrés.

Si l’espace de dégagement

est insuffisant utiliser une

barre d’écartement.






THIS LABEL IS LOCATED

ON EACH CORNER BY

THE LIFTING HOLE

Fig. 2-3. Recommended method of lifting Entellisys enclosure