Entellisys Low Voltage Switchgear

Chapter 2. Receiving, Handling, and Storage

2-3 Storage

Switchgear

If it is necessary to store the switchgear equipment for any

length of time, the following precautions should be taken to

prevent corrosion or deterioration.

1.

Remove protective covering. Check thoroughly for

damage.


2.

Store in a clean, dry, rodent-free location with moderate

temperature and provide protective coverings to prevent

dirt, water, or other foreign substances from entering

the switchgear.


CAUTION: Remove all cartons, containers and any other

miscellaneous packaging and packing material from inside

the switchgear sections before energizing any internal

heaters. To prevent fire, remove any plastic or polyethylene

shrouding from the switchgear sections before energizing

any internal heaters.

ATTENTION: Enlever tous les cartons, contenants et tout

autre objet varié servant à l’emballage et au matériel

d’emballage de l’intérieur des sections du dispositif de

commutation avant de procéder à la mise sous tension de

tout radiateur interne. Pour éviter un incendie, enlever tout

résidu de plastique ou de polyéthylène des sections du

dispositif de commutation avant de procéder à la mise sous

tension de tous les radiateurs internes.

3.

If dampness or condensation may be encountered in the

storage location, heaters must be placed inside the

switchgear sections to prevent moisture damage.

Approximately 250 watts of heat in each section is

required. Incandescent lamps may be used for this

purpose. These lamps should be located in the bottom

breaker compartment of each section and supported so

the bulbs will not touch adjacent materials.

CAUTION: If the space heaters are to be temporarily

energized from an external source, it is important to

remove the fuses on the secondary side of the control

power transformer. This precaution is to prevent a feed

back of higher voltage to other portions of the equipment

through the CPT primary.

ATTENTION: Il est important de retirer les fusibles du

côté secondaire du contrôle du pouvoir du transformateur

si les espaces des radiateurs doivent être temporairement

mis sous tension par une source externe. Cette précaution

prévient une rétroaction d’un voltage supérieur à d’autres

portions de l’équipement par le contrôle de pouvoir du

transformateur primaire.

Circuit Breakers

If circuit breakers are not to be placed into service at once,

remove them from their shipping cartons and thoroughly

inspect them for damage. If the breakers are in satisfactory

condition, replace the breakers in their shipping cartons for

storage. Do not remove the circuit breaker shipping members

at this time.

Store the circuit breakers in a clean, dry location in an

upright position. They must be properly supported to

prevent bending of the studs or damage to any of the breaker

parts. Do not remove any protective grease until the circuit

breakers are ready to be installed. A plastic or canvas-type

cover should be provided to reduce the possibility of damage

to the breakers due to dust and water.

Advertising