If studs or anchor bolts are to be used, they should be

installed in the foundation as it is poured. It is important

that the studs or bolts are spaced to agree with

dimensions given on the General Electric job drawings.

The dimensions between anchor bolts for a particular

installation are dependent upon the configuration of

equipment ordered. The dimensions shown on Fig. 4-2

cover all of the standard enclosures available for

Entellisys Switchgear.

Fig. 4-3 illustrates the space available for conduit and/or

cable entrance through the bottom or top of each

equipment section. The space required for control wiring

entry to the optional wiring trough is also shown.


NOTE: BUS COMPARTMENT

BARRIER LOCATION - WHEN

THIS OPTION IS PROVIDED, IT

REDUCES AVAILABLE SPACE FOR

CABLES

ABOVE BY (5) INCHES






Equipment

Depth “A”

Direction

of Leads

B

60” non-fused or

Below

19

67” with fused EGF-08/16

Above

24

67” non-fused or

Below

26

74” with fused EGF-08/16

Above

31

74” non-fused or

Below

33

81” with fused EGF-08/16

Above

38

Fig 4-3. Floor plan and cable entry space