6

Entellisys Low Voltage Switchgear

Chapter 2. Receiving, Handling, and Storage

Fig. 2-6. Method of rolling equipment into place

7.

While carefully pushing the switchgear to its final site

position, the rollers that are freed from the rear of the

switchgear are then repositioned at the forward end.

This procedure should be continued until the

switchgear is in its final location. See Fig. 2-6.


8.

When the switchgear is in its final position, remove all

lag bolts holding the shipping skids to the switchgear

line-up.

9.

Insert the tines of the forklift at one end of the line-up,

raise slightly, and remove the loose rollers.


10.

Lower the end of the gear carefully to the floor.


11.

Raise the other end of the line-up slightly and remove

the remaining roller at that end.

Jacks

Jacks may be used in place of forklifts to raise and lower

switchgear.

1.

Place a jack under the front and rear corners of one end

of the line-up.

CAUTION: Do not place jacks in any other location other

than the front and rear corners of the switchgear. Doing so

may result in serious damage to the switchgear equipment.

ATTENTION: Il ne faut pas placer de vérins en aucun

endroit autre que les coins avants et arrières du dispositif

de commutation. L’équipement peut être sérieusement

endommagé si l’on ne respecte pas cette directive.

2.

Raise the switchgear evenly and just enough to position

a roller beneath the equipment. Gently lower the

switchgear onto the roller. Repeat the procedure at the

opposite end of the switchgear, raising the gear far

enough to place the appropriate number of rollers under

the skids, spacing them evenly across the width of the

line-up. Gently lower the gear onto the rollers.


3.

While carefully pushing the switchgear to its final site

position, the rollers that are freed from the rear of the

switchgear are then repositioned at the forward end.

This procedure should be continued until the switchgear

is in its final location.


4.

When the switchgear is in its final position, remove all

lag bolts holding the shipping skids to the switchgear

line-up.


5.

Place one jack at each corner, front and rear, of the

switchgear. Carefully raise the line-up evenly and

remove the rollers and the shipping skids. Evenly lower

the line-up to the floor and remove the jacks.