Entellisys Low Voltage Switchgear
Chapter 4. Equipment Installation
Breaker Hoist
Fig. 4-18 shows the breaker hoist assembled on a switchgear
lineup. The hoist is shipped in a separate carton completely
assembled, Fig. 4-19.
Before attempting to install the hoist assembly on the
switchgear equipment, it is necessary to remove the runner
guide from the hoist carriage as shown in Fig. 4-20. Do not
dispose of this guide since it must be reinstalled after
mounting the hoist on the equipment.
NOTE: Maximum recommended lifting capacity is 700
lbs.
NOTE: La capacité maximale recommandée de
soulèvement est de 700 livres.
Fig. 4-18. Breaker hoist assembly
Fig. 4-19. Carton containing breaker lifting device
Fig. 4-20. Removal of hoist runner guide