4-1 General

This chapter contains complete instructions for installing

General Electric Entellisys Low-Voltage Switchgear.

CAUTION: Personnel installing this equipment must be

thoroughly familiar with this instruction manual and all

articles of the National Electrical Code applicable to the

installation of this switchgear. In addition, all drawings,

both mechanical installation and electrical, must be

understood and strictly followed to prevent damage to the

switchgear or equipment being protected by the

switchgear.

ATTENTION: La ou les personnes procédant à

l’installation de cet équipement doivent être tout à fait

familier avec ce livre d’instruction ainsi que tous les

articles du Code national d’électricité s’appliquant à

l’installation de ce dispositif de commutation. De plus, tous

les dessins se rapportant tant à l’installation mécanique

qu’électrique doivent être compris et suivis à la lettre afin

de prévenir des dommages au dispositif de commutation ou

à l’équipement protégé par celui-ci.

NOTE: Before installation work is started, it is important

to review all of the drawings provided, including the

General Electric equipment arrangement drawings, site

installation drawings, elementary and remote connection

drawings, mechanical connection drawings, and the

summary of equipment list.

NOTE: Il est important de reviser tous les dessins fournis,

incluant les dessins de disposition de l’équipement de

General Electric, les dessins d’installation du site, les

dessins de raccords élémentaires et à distance, les dessins

de raccords mécaniques et le sommaire de la liste

d’équipement avant que ne débutent les travaux

d’installation.


All expendable hardware for shipping purposes only, is

painted yellow or tagged with yellow adhesive and may be

discarded at completion of the installation phase.

Site Location

In general, the location of the switchgear equipment will

have been predetermined during the specification and/or

procurement of equipment phases. Indoor locations within

buildings impose certain requirements that must be met so

that the switchgear may operate efficiently with a minimum

of maintenance.

In locating the Entellisys Switchgear, adequate aisle space

must be provided at the front and rear of the equipment to

ensure proper ventilation of the equipment and to allow

service and maintenance of the equipment with the front and

rear doors open. The recommended aisle space is shown on

the floor plan supplied with the equipment drawings.

The switchgear equipment should be placed in an area where

clean, dry air is free to circulate around and above it. Since

air is taken into the equipment at the bottom of each section

and exhausted at the top, a location with good airflow must

be provided for efficient operation. A minimum of 30 inches

of clear space above the equipment is recommended.

Foundation Requirements

For optimum performance of your General Electric

switchgear equipment, the foundation requirements

expressed in this chapter should be strictly adhered to.

NOTE: The foundation for the outdoor switchgear must

provide proper drainage of ground and/or surface water

accumulations away from the equipment.

NOTE: La fondation du dispositif de commutation situé à

l’intérieur doit être en mesure de drainer correctement les

accumulations d’eau du sol et de surface loin de

l’équipement.

The foundation must be strong enough to prevent sagging

due to the weight of the switchgear structure and to

withstand the shock stress caused by the opening of the

breakers under fault conditions. The shock loading is

approximately 1-1/2 times the static load.

The foundation must be flat and level in all planes. Refer to

Fig. 4-1 for definition of flat and level.

Fig. 4-1. Definition of flat and level

Foundation Preparation

Refer to Fig. 4-2 along with the owner's foundation

construction drawings, and the General Electric supple-

mental installation drawings. Although the indoor

switchgear equipment can be mounted directly on a smooth,

level floor, it is recommended that recessed steel channels be

installed for supporting the equipment. Anchor bolts and

channels are to be provided by the purchaser.