28

Entellisys Low Voltage Switchgear

Chapter 4. Equipment Installation

Fig. 4-5. View showing method of attaching equipment to shipping

skids

NOTE: All mating sections of the equipment line-up

(including transformer, if applicable) must be securely

fastened together prior to tightening anchor bolts

fastening the equipment to the mounting surface.

NOTE: Toutes les sections se rapportant à la disposition

de l’équipement (incluant le transformateur si tel est le

cas) doivent être retenues ensembles solidement avant de

resserrer les boulons d’ancrage qui retiennent

l’équipement à la surface de montage.

2.

REMOVE THE SHIPPING SKIDS-The equipment is

fastened to the shipping skids with 3/8-3 lag screws

through the equipment anchoring holes. See Fig. 4-5.


Equipment shipping sections up to 10 feet long will be

fastened to the skids with four lag screws, one in each

corner. Longer sections will have two additional lag screws

which are located near the middle of the equipment. The

shipping skid and lag screws are expendable material and

may be disposed of at the purchaser's discretion.

3.

FASTEN SECTIONS TOGETHER-After placement of

the equipment and installing the anchor bolts loosely,

the various shipping sections must be rigidly fastened

together. Through-bolts fasten each section of the

switchgear equipment to the adjacent section. Fig. 4-6

shows the location of the through-bolts.

Fig. 4-6 Location of through-bolts