GE Industrial Solutions Entellisys Installation User Manual

Page 38

Advertising
background image

32

Entellisys Low Voltage Switchgear

Chapter 4. Equipment Installation

After completing the installation of the main bus splice bars,

the joint covers may be mounted and secured by a 3/8-16

nylon bolt and polyester flat washer if the bus insulation

option has been supplied with the equipment.

5.

CONNECT THE TRANSFORMER SECONDARY - The

connection of the transformer secondary to the incoming

bus bars in the transition is made using the flexible

connection straps supplied with the transformer. These

connections are always bolted joints.

The recommended torque for tightening the ½-13 bolts

fastening the transformer connection straps to the incoming

bus bars is 35-40 ft-lbs.

6.

INTERCONNECT ENTELLISYS CONTROL AND

COMMUNICATION WIRING - Interconnection of

control wiring across shipping splits is accomplished by

connecting to terminal blocks located in the cross-

section wiring trough on top of the equipment shown in

Fig. 4-14. Ethernet cables are connected by similarly

routing them across the top of the equipment and down

the gear, between the compartment side sheets.

If terminal blocks are provided, each wire must be attached

to the correct point on the terminal block, following the

circuit identification number attached to each wire.

Fig. 4-14. Interconnect control wiring and Ethernet cables in the wiring trough

on top of the equipment