2 installation, 1 instrument setup, 1 packaging – Metrohm 833 IC Liquid Handling Unit User Manual

Page 19: 2 checks, 3 location, 4 arranging the instruments, Installation, Instrument setup, Packaging, Checks

Advertising
background image

2.1 Instrument setup

833 IC Liquid Handling Unit / Instructions for Use 8.833.1003

11

2 Installation

2.1 Instrument

setup

2.1.1 Packaging

The 833 IC Liquid Handling Unit and its separately packed accessories

are supplied in very protective special packaging. These contain

impact-absorbing plastic foam linings contained inside a blue plastic

film; these are molded to fit the individual components. The instrument

itself is contained in a dustproof evacuated polyethylene bag. Please

store all this special packaging; it is the only way in which the safe

transport of the instrument can be guaranteed.

2.1.2 Checks

Please check that the delivery is complete and undamaged

immediately on receipt (compare with delivery note and list of

accessories given in Section 10.2). If transport damage is evident

please refer to the information given in Section 10.5.1 "Warranty".

2.1.3 Location

Place the instrument on a vibration-free bench in a favorable position

for operation and protected from corrosive atmospheres and

contamination by chemicals.

2.1.4

Arranging the instruments

Other IC instruments (e.g. 818, 819, 820) can be stacked on top of the

833 IC Liquid Handling Unit. It is best to place it beside the modular IC

system or at the bottom of the stack.

The 833 IC Liquid Handling Unit should always be at the bottom so

that any leaks which may occur in the pump tubing or connections

cannot cause any great damage by escaping liquids (e.g. acids).

Advertising