To modular ic system for cation separation – Metrohm 833 IC Liquid Handling Unit User Manual

Page 52

Advertising
background image

6 833 IC Liquid Handling Sample Preparation Unit

833 IC Liquid Handling Unit / Instructions for Use 8.833.1003

44

6.2.1.1

Electrical connection

The electrical connections of the system, consisting of 819 IC Detector,

820 IC Separation Center (2.820.0X30; 1-channel + MSM), 818 IC

Pump, 833 IC Liquid Handling Pump Unit, 833 IC Liquid Handling

Sample Preparation Unit and 830 IC Interface are shown in Fig. 14:

Fig. 14:

Connection of 833 IC Liquid Handling Sample Preparation Unit
to modular IC system for cation separation

6.2.1.2

Connection of the sample preparation module

The following description assumes the use of a 2.820.0X30 IC

Separation Center (1-channel system, MSM).

The 1.793.0110 Sample Preparation Module must first be inserted in the

820 IC Separation Center and connected to the basic instrument of the

833 IC Liquid Handling Sample Preparation Unit (833 Sample

Preparation in Fig. 14).

833 Sample Prep

833 Pump

830

820

818

819

PC

6.2134.100

6.2134.080

6.2134.090

6.2134.130

6.2143.210

6.2115.070

6.2125.120

6.2125.090

6.2141.110

6.2128.180

6.2128.180

766

6.2134.040

Advertising