ADS Environmental Services FlowShark QR 775002 A4 User Manual

Page 132

Advertising
background image

6-6

ADS FlowShark Manual

4. (optional) Enter the new location Description.

5. Verify that the monitor Series is FlowShark. If the monitor

will be involved in Modbus communications, select FlowShark
RT
from the Series drop-down list.

6. Select the appropriate method of communication from the

Connect Using drop-down list. When choosing the MODEM
option, select the appropriate Baud Rate.

7. Enter the monitor location Telephone Number or the IP

Address for the wireless connection.

Note: When entering an IP Address, do not include
leading zeroes in the address. For example, an IP Address
of 166.213.008.063 should be entered as 166.213.8.63. If
leading zeroes are included in the address, monitor
communications will not be successful.

8. Enter the monitor Serial Number.

9. Enter the number of hours difference between your location (or

the location of the computer on which the database resides) and
the location of the monitor in the Time Zone field. For a
monitor in a time zone earlier than the time zone in which you
are located, enter a minus sign before the number of hours
difference. For example, if you are in the Central time zone and
the monitor is located in the Eastern time zone, select 1 from
this field.

10. (optional) Enter the vertical distance from the manhole rim to

the manhole invert in the Manhole Depth field.

11. Select the rate at which you want the monitor to log data from

the Normal drop-down list.

12. Select the increased rate at which you want the monitor to log

data for the duration of an event from the Fast drop-down list.
This designation applies only when implementing the Dual
Data Rate feature in the Advanced Configuration options.

Advertising