Gathering the tools and equipment – ADS Environmental Services FlowShark QR 775002 A4 User Manual

Page 62

Advertising
background image

3-28

ADS FlowShark Manual

Quantity

Description

ADS Part Number

as

required

ultrasonic depth sensor surcharge

mounting bracket

I40-0010

1

special predrilled 8-foot metal band

I40-0007

1

Extension cables can be ordered in specific lengths up to 300 feet. Note

the desired length (in feet) in the xxx portion of the part number. For
example, if the application requires a 50-foot extension cable for an
ultrasonic depth sensor, the part number would be 103228A–050.

2

Pressure depth sensors also are available in 0–15 PSI (p/n 3704–0042–

35) and 0–30 PSI (p/n 3704–0016–40).

Gathering the Tools and Equipment

Gather the following tools for the installation:

Battery-powered hammer drill with assorted bits, including the
following at a minimum:

 3/8-inch x 4-inch (minimum length) masonry bit

 ¼-inch masonry bit (F35-0018)

 5/16-inch carbide-tipped drill bit (include smaller bits)

4-pound hammer

Rubber mallet

24-inch carpenter’s level

Wrenches

Screwdrivers (flathead and Phillips head of assorted sizes)

3/8-inch x 16-inch threads tap

Diagonal wire cutters

Folding carpenter’s rule with a brass slide

Mastic tape (ADS p/n 507193) or rubber coaxial stretch tape

Advertising