Inspecting the monitor, Confirming the monitor – ADS Environmental Services FlowShark QR 775002 A4 User Manual

Page 215

Advertising
background image

Maintenance and Troubleshooting 10-3

Inspecting the Monitor

Perform the following inspections during site visits or from a
remote location (when applicable):

Inspect the monitor mounting bracket to verify that the bracket
and bolts are free of heavy corrosion and the bolts are tightened
and secure.

Verify that the four bolts holding the monitor together are snug,
and tighten any loose bolts.

Verify that the monitor is mounted securely in the manhole.

Inspect the monitor for general integrity. Verify that nothing
more than surface corrosion is present and that the monitor has
no obvious mechanical defects. Replace the monitor if
necessary.

Perform monitor data confirmations. These should occur from a
remote location when telephone communication is available.

Review the applicable logs in Profile

to verify the status of

the monitor clock, communications, firmware, battery pack(s),
and temperatures.

Clean the monitor and sensors regularly with a soft bristle
brush and paper towels. However, do not use detergent!

Make sure all connector ports on the monitor top are dry. Use
compressed air or paper towels to dry out wet or damp
connectors.

Confirming the Monitor

Confirm the accuracy of the sensor subsystems in the monitor on a
regular basis. Confirmation involves comparing manually-measured
depth of flow and velocity readings to the monitor's readings. This
process also verifies sensor parameters. Refer to the Profile User's
Guide
(#950015**) for detailed information on performing
confirmation procedures.

Advertising